During the implementation of the private sports school project, the key objective was to create a healthy, stable, and energy-efficient indoor climate essential for training, education, and athlete recovery.
The installed Aerostar climate equipment made it possible to:
ensure efficient ventilation and fresh air supply throughout all areas of the school;
maintain comfortable temperature and optimal humidity levels;
create favorable conditions for physical activity and learning;
ensure reliable system operation during continuous use;
optimize energy consumption through properly selected solutions.
Project implementation:
— PoolStar-13 ventilation unit
— chiller
— GreenSTR-13 air handling unit
— GreenSTR-6 air handling unit