During the implementation of the Sharsk Central Hospital project, the key objective was to ensure a safe, stable, and controlled indoor climate in medical areas, meeting strict air quality and hygiene requirements.
The installed Aerostar equipment made it possible to:
provide efficient air supply and purification in medical zones;
maintain stable temperature and air exchange parameters;
enhance sanitary safety through high-efficiency air filtration;
ensure reliable and uninterrupted system operation in 24/7 mode;
implement automated control of ventilation and climate systems.
Project implementation:
— SkyStar-4 air handling unit
— HEPA Box (high-efficiency air filtration)
— compressor-condenser units (CCU)
— automation system